• ( English )
    • English
    • 繁體中文
    CLOSE
  • ABOUT US
  • PRODUCT
    • Back
    • CSD
      • Back
      • CSD-100
      • CSD Duo
    • ASD
      • Back
      • QUARTAS-500s
      • QUARTAS-2000s
      • FANFARE-2000
      • FANFARE-4000
    • Networking
      • Back
      • NIM Interface Module
      • NCP Control Panel
      • AMS Software
    • Peripheral
      • Back
      • APS Power Supply
      • ASH Strobe Horn
      • ASM Sensor Modules
      • PASD Portable ASD
      • Demo Kit
    • Pipes & Accessories
      • Back
      • Pipes, Fittings and Accessories
    • OEM/ODM
      • Back
      • Private Label
      • Core Modules
      • New Design
  • TECHNOLOGY
  • APPLICATION
    • Back
    • Electrical Cabinet
    • Data Center/EDP
    • Cleanroom
    • Warehousing
    • Heritage
    • Harsh Environment
  • SUPPORT
    • Back
    • AvaFlow Design Tool
    • Design
    • Installation
    • Commissioning
    • Maintenance
  • WHAT'S NEW
    • Back
    • News
    • BLOG
    • Note
  • ( English )
    • Back
    • English
    • 繁體中文
  • Copyright © 2017 MIRACLE

APPLICATION

1 / 6
Electrical Cabinet
  • PriceUSD$
  • Our price:USD$
  • Use bonus pointspt.
Abstract:
AVA has integrated the advantages of aspirating detection and traditional point-type smoke detector to enable the system not only to achieve very early warning fire detection provided by typical aspirating detection system but also to locate the fire origin as point-type smoke detector. Compared with other brands of products which typical detection area per detector is 2000m2, AVA series products have limited the detection area to be within 500m2 per detector and the CSD furfure down to be within 100m2 per detector, equivalent to the protection area of a point-type smoke detector. So when AVA systems is in alarm, users can easily identify the fire location, solving the problem that typical aspirating detection systems can only provide large-area warning but fails to pin point the exact location of the fire.
 
ADDRESSABLE
AVA has integrated the advantages of aspirating detection and traditional point-type smoke detector to enable the system not only to achieve very early warning fire detection provided by typical aspirating detection system but also to locate the fire origin as point-type smoke detector. Compared with other brands of products which typical detection area per detector is 2000m2, AVA series products have limited the detection area to be within 500m2 per detector and the CSD furfure down to be within 100m2 per detector, equivalent to the protection area of a point-type smoke detector. So when AVA systems is in alarm, users can easily identify the fire location, solving the problem that typical aspirating detection systems can only provide large-area warning but fails to pin point the exact location of the fire.
 
Electrical Cabinet,Aspirating smoke detector,ASD,AVA,AVAMA,Power Company,High Tech Factory,Telecom,IDC,VESDA
 

 

PARTIAL CUSTOMER LIST

Taiwan Power Company

 
  • TPC
    Ban-Qiao Jing-Xing Substation
    : SSTR Panel    
    Hsin-Chu1st Substation
    : SSTR Panel 
    Zhu-Wei 161KV EHV Substation
    : Electric Room
    Miao-Li Tong-Luo
    : Substation
  • Shanghai Municipal Electric Power

High Tech Factory

  • Cxmt Hefei (12-inch fab)
  • Kunshan CHIMEI Materials Technology Corporation
  • Mantix Display Technology
  • HKC Display Technology Chongqing Jinyu Optoelectronics
  • Sdi Corporation Rainbow Photovoltaic Power Plant 3.5 Generation Factory
  • KFES Lighting (Xiamen)
  • UMC 8S Plant: Electric Room
  • Unimicron Xing-Ban 2nd Plant: Electric Room
  • Ablytek Solar Energy Pingtung Plant: Electric Room
  • WIN Semiconductor Corp 
    1st Plant
    : Cleanroom 
    Guishan Plant: Cleanroom
  • HannsTouch Solution Incorporated Tainan Fab: Cleanroom
  • Realtek Semiconductor Corp: Electric Room
  • CHI MEI Corporation ABS Plant: Substation
  • Crystalwise Technology Inc. Chunan Plant: Electric Room & IT Room 
  • PAN JIT INTERNATIONAL INC.: Electric Room and Cleanroom
  • BASF MEP Taichung: Electric Room 
  • Hermes Microvision Inc. Tainan Plant:Cleanroom/Electric Room/IT Room
  • Epistar Actualize LED
    N3 Plant
    N8 Plant
    S1 Plant
    S3 Plant

    Taichung H Plant
  • TAIWAN Huga Optotech Inc
  • Tanida Clean Room
  • Unitech printed circuit board corp
  • HSMC Wuhan Hongxin Semiconductor Manufacturing
​

Telecom/IDC

 
  •  Taiwan Stock Exchange Yang De Building
  • ​Chunghwa Post: Electric Room/Server Room/Office/UPS
    Taipei Control Center
    Taichung Backup Center
  • Chief Telecom: UPS Room/Batteries
  • Chunghwa Telecom Mobile
    Communication Branch Nangang site: Mobile Telecommunication Room
    Chunghwa Telecom Renai Building 1
    , 2, 3, 7 Floor (Taiwan Stock Exchange): Data Center
    Chunghwa Telecom Banqiao Data Center (18K)
    ​Chunghwa Telecom Banqiao, Hualian, Hsinchu, Miaoli, Xinzhuang: Data Center ​
    Chunghwa Telecom Mobile Communication Branch Kaohsiung Shiquan/Juemin/ ErlingTa, Tainan Yongkang, Taichung Changer:Mobile Telecommunication Room
    Hydropower Fire
    Very early equipment for new construction (18K)
  • Taiwan Mobile
    Taichung 14 Plant
    Neihu IDC computer room
  • Far EasTone Telecommunications:UPS Room/Battery Room/Electric Room
    PC326
    NH468
    Taichung(1F&4F) 
 

Petroleum

 
 Taiwan Synthetic Rubber Corp.: Substation
  • Nan Ya Plastics               
    Shu-Lin No.3 Plant: Electric Room    
    Mai-Liao 2EH Plant: Electric Room                     
    Mai-Liao EG1 Plant: Electric Room                 
    Mai-Liao EG2 Plant: Electric Room                 
    Miao-Liao INA Plant: Electric Room
    Xin-Gang Glass Fabrics No.1 Plant: Electric Room
    Xin-Gang Glass Fabrics No.4 Plant: Electric Room
  • Formosa Plastics Mai-Liao
    MMA Plant & SAR II Plant
    AE Plant
    AN Plant
    C4 Plant
    EVA Plant
    ECH Plant
    HDPE Plant
    LLPE Plant
    SAP Plant
    VCM Plant
    PE Technical Office
    PVC Plant
    Soda plant
    Carbon Fiber Factory
    Inspection Center
    Xu Elastic Fiber Factory
    Storage Area of Chemical Department
  • Formosa Plastic Ren
    Wu Alkaline Plant
    Wu Plant Plastic 2nd Section: UPS Room
  • Eternal Materials Da-Fa Factory
    Switchgear, Production Line
    Cleanroom 
  • CPC Da-in Factory, KAOHSIUNG
    Project 1: All Electric Rooms, Refinery 3
    Project 2: Substation #3
    Project 3: All Electric Rooms, Refinery 1
    Project 4: 161KV, R-CHAW & KAOSUNG TANK FARM
    Project 5: RFCC Load Center #10
    Project 6: Substations, Sulfur Recovery Unit #4 & gas hydrogen desulfurization  #2
    Project 7: MCC Panel Room, Alkylation Unit
CPC
  • Chien-Cheng Petrochemical Storage Center: All MCC Panels
  • Lin-Yuan Factory: Substation
  • Tao-Yuan Factory: Wu-Gu & Sha - Lun Petrochemical Storage Center            
  • Yao-Yuan Factory: Substation #9 and Substation #1    
  • LNG Yong-An Factory: Substation #2 and Substation #7 
​

Steel Plant​

  • China Steel Corp
    Electric Rooms, W5/Power 2nd Plant
    W5/Power 1st Plant & Turbine House
  • TS Steel CO., LTD.: Electric Room
  • Dragon Steel

Airport

  • International Airport
    Taoyuan 
    Kaohsiung
    Songshan 
  • Pingtung Air Station

Laboratory

  • National Nano Device Laboratories: Cleanroom
  • Hua-chuang Automobile Information Technical Center: Battery Laboratory

Others

  • Taichin Global: Boiler/Electric Room
  • Formosa TV Linkou Headquarter
  • Banqiao Affordable Housing: Electric Room

  

Back to the top
  • Our price:USD$
  • PriceUSD$
CONTACT
AVA PREVENT CO., LTD
Rm. 4, 2F., No. 700, Zhongzheng Rd., Zhonghe Dist., New Taipei City 235, Taiwan (R.O.C.)
+886-2-8228-0508
inquiry@ava-prevent.com
TOP
 
256 bit SSL Encryption
Recommend using Chrome, Firefox, Safari latest version of the browser.